cheap rolex replica for many years.

stern making desires can be rather long not to mention responsible exact replica watch insurance.

discount swiss replica watches for sale at online shop.
replica rolex reddit has always been the most loyal representative of excellence in quality.

best rolex replica state-of-the-art structure floored the modern world.

Flowline Replacement Contract (Contract No C311386)

  • Client : Petroleum Development of Oman
  • Project: Long-term contract with PDO for executing Flow-line integrity and replacement services.
  • Main Scope: Design & Construction of CS Bare Flow lines, FBE Coatings and Fittings, HDPE and LLRTP Pipe Works, Rig Location and Hoist Location Preparation Works (Civil Works), Electrical and Instrumentation works
  • Operating areas: Yibal, Fahud & Lekhwair
  • Additional Activities: Bend Fabrication, Industrial Facilities, Road Construction, Road Repairs and markings, cold room facilities, Manpower Supply, Procurement
  • Contract Value: US$ 156 Million on a progressive basis
  • Contract Period: 10 years starting from 2012


Oxy Oman – Oil Field Construction Services

  • Client: Occidental Oman.
  • Scope of Work: Construction of new pipeline distribution systems, which inter connect wellheads, satellites and central processing facilities throughout the Safah and Wadi Latham field concessions. Piping Fabrication such as cutting, Fabricating and welding wellhead location piping, interconnecting piping for vessels, complex oil & gas facility piping and Civil/Mechanical Services such as concrete works, civil work associated with surface laid and buried pipelines, scaffolding for high level access, structural fabrication of racking and access platforms.
  • Contract value: US$ 30 Million
  • Contract period: 3 years from Aug 2015
 
 
 
123movies